Battersea Power Station
Sectors:
Client: Ronin Events, Battersea Power Station
Using:
How do you make safe the long abandoned and derelict interior of the world famous Battersea power station safe and secure for thousands of visitors attending an event? Giant roadplates of course! Oh and it’s now Friday morning and the event is Saturday night!
We sent some big 6m x 3m and some slightly smaller 4m x 2m into Battersea and placed over some cavernous pits in the old turbine room floor.
In order to cover the largest voids, a scheme of marking and overlapping plates was adopted. The whole thing was lifted into place by our Scania 8 wheeler and its 36 t/m crane using the SALLY safe-lifter system.