Modular Air Systems – Robin Hood School, Sutton
Sectors:
Using: 4×4 Towing Vehicles
MAS had been let down at the last minute by another supplier and contacted RoadPlateHire looking for a solution to spread the load of an 80 tonne AT crane over a footway.
Space on site was at a premium as Traffic Management/Road Closures had been organised and the works installing a large set of modular classrooms was scheduled for the Sunday.
10 off ‘POLYROADS’ with their unique combination of SALLY sockets and 3m x 2m panel sizes allowing to be delivered safely to site by a 4×4 tow vehicle and our lightweight flat trailer.