BNP Paribas/NHS Shrewsbury and Telford – Shrewsbury Hospital

Sectors:

BNP Paribas/NHS Shrewsbury and Telford - Shrewsbury Hospital

Using: 3m x 1.5m x 25mm Anti Skid – Steel C/W Bevelled Edge and SALLY

A maintenance crew had a substantial schedule of works to perform on half a kilometre of underground pipework. The steam lines in question, were inside a network of sectional reinforced tunnels, directly under the access roads for the busy staff car parks. Health and safety considerations called for the live traffic sections to be plated over to ensure there could be no chance of a partial collapse on the crews inside. We were able to send 135 pieces of 3.0 x 1.5 x 25mm SALLY plates at 883 kgs each, ALL that was required was 2 x ABLOADS and a curtainsider with Moffett to unload all 3 trucks and position the entire 120 tonne set up. All of which had to happen 3 hours trucking away from the RPH yard, and between the hours of 18.00h and 01.00h so as not to interfere with the coming and going of medical staff. It all went smoothly, and 8 weeks later when the phase was complete, the manoeuvre was reversed with complete success.