Case Studies in Ports, rail and shipping

Other sectors:

TVCB – A solid response

Using: TVCB (Temporary Vehicle Control Barrier) There is no faster way to deploy a very real physical barrier than with 2 and a half tonnes of reinforced concrete in the form of a TVCB. That’s what the intruders at a communal field in Sayers Common in Sussex found out when we delivered two within half…

Read more…

Ashtead Level Crossing Works – Network Rail

Using: 6m x 3m x 25mm Anti Skid – Steel C/W Bevelled Edge and SALLY A fundamental planning oversight from many years ago had left a Network Rail maintenance manager with a really serious problem. A section of roadway on a level crossing was in dire need of repair. This would normally a difficult enough…

Read more…

Platform works – Eurostar TMD – Temple Mills, London

Using: 2.0m x 2.0m x 25mm Anti Skid – Steel C/W Bevelled Edge and SALLY A customer with Eurostar as a client was commissioned to do some extensive works on the rolling stock maintenance workshops at Temple Mills ‘Train Maintenance Depot’ (TMD). As one would expect, Eurostar are an operation with significant engineering expertise and…

Read more…

Who’s the only firm that could take the strain at the Liverpool docks?

Using: SERIES 38 – Steel C/W Bevelled Edge and SALLY Something that anyone who has seen the truly massive portside container cranes at Liverpool 2 Docks may not have considered is how they got there. Had you asked us before this project, we might have assumed that they were assembled on site, out of locally…

Read more…