Case Studies in rail and shipping

Other sectors:

A peaceful resolution – Former Kodak building, Reading

Using: Articulated Units c/w HIAB (Lorry Loading Cranes) Just as the large site formerly home to Kodak was being prepared for demolition in order  to be redeveloped, an armada of marauding caravans arrived and occupied the recently cleared out areas. Quick action was required before too much of the accompanying mess was generated. It was…

Read more…

Ferrybridge Power Station – West Yorkshire

Using: 3m x 1.5m x 25mm – Steel C/W SALLY In 2016 the power generator SSE has took its final investment decision to proceed with the Ferrybridge Multifuel 2 project in West Yorkshire, and we became involved in the construction phase early in 2017. Some heavy kit was required on site, including the requirement to…

Read more…

Working with Veolia at Swan Hunter Shipyard

7.5m x 3m x 25mm Anti Skid – Steel C/W Bevelled Edge and SALLY We were contacted by Veolia Environmental Services about an important project at the Swan Hunter former shipyard in Tyneside. They are embarking on the ambitious task of a safe and sustainable decommissioning and recycling of 8 former gas platforms, at 18…

Read more…