Airside – London Heathrow

Road Plate Hire - London Heathrow

Using: 3m x 1.5m x 25mm Airside – Steel C/W Bevelled Edge and SALLY Having supplied plates for ‘airside’ projects in the past we were aware of some of the problems faced by these challenging sites. Normal friction treatments were unsuitable for various reasons including; Should the resin-grit become unadhered due impact, bending of plates…

Read more…

Barriers and blockers – Various sites U.K

Road Plate Hire - Road plates with SALLY sockets and bevelled edges

Using: Heavy duty – SERIES 38 – Steel C/W Bevelled Edge and SALLY In a programme of security upgrades a client had a series of sites whose vehicle access security was handled by automated or manned barriers. This is due unfortunately, to a world full of hostile actors, which as the headlines will show, have…

Read more…

Chelmsford Racecourse – Betfred

Road Plate Hire - Betfred

Using: 4m x 2m x 25mm Anti Skid – Steel C/W Bevelled Edge and SALLY As part of a substantial work on the recently constructed facilities at the racecourse, some really big equipment and large structural elements were required on the infield area of the course. One thing was for absolute certain was that the…

Read more…

Platform works – Eurostar TMD – Temple Mills, London

Road Plate Hire - Eurostar Station road plates

Using: 2.0m x 2.0m x 25mm Anti Skid – Steel C/W Bevelled Edge and SALLY A customer with Eurostar as a client was commissioned to do some extensive works on the rolling stock maintenance workshops at Temple Mills ‘Train Maintenance Depot’ (TMD). As one would expect, Eurostar are an operation with significant engineering expertise and…

Read more…

Reinforcement of pedestrian block paving for Versalift access – Library of Birmingham

Road Plate Hire - Pedestrian Block Paving

Using: 2.5m x 1.25m x 25mm (8ft x 4ft x 1 inch) Anti Skid – Steel The Library of Birmingham, sited in the pedestrianised ‘Centenary Square’, Birmingham, wanted to install an eco-friendly and energy efficient combined heating and cooling units. To do this, rather bringing in a truly massive crane, capable of reaching over the…

Read more…

SGN-SSE Gas Main Replacements – South East London

Road Plate Hire - SNG Gas

Using: 2.5m x 1.25m x 12mm (8ft x 4ft x 1/2 inch) Anti Skid – Steel The gas main replacement schemes being carried out across the country at present are for many kilometres either 125 mm, 250 mm and 300 mm diameter pipe and therefore mainly involve trenches of less than 400 mm width. So…

Read more…

Sediment Tanks – Waste Water Treatment Works – Kent

Road Plate Hire - Waste treatment works hole covered with road plates

Using: 7.5m x 3m x 25mm – Steel C/W SALLY An area within a WWTW previously used as a sediment tank required some extensive civil work. One troublesome feature was the open top of the tank that was adjacent to where men would be working. Options such as fencing off or surrounding with concrete blocks…

Read more…

Ferrybridge Power Station – West Yorkshire

Road Plate Hire - Ferrybridge Power Station

Using: 3m x 1.5m x 25mm – Steel C/W SALLY In 2016 the power generator SSE has took its final investment decision to proceed with the Ferrybridge Multifuel 2 project in West Yorkshire, and we became involved in the construction phase early in 2017. Some heavy kit was required on site, including the requirement to…

Read more…

Rampion Off Shore Wind Farm – Access 4

Using: 3m x 1m x 70mm Ekki/Wooden Mats Creating roadways across land for a project like the Rampion off shore wind farm is always a challenge. Not least when the stakeholders and landowners are one of the world’s largest pharmaceutical companies with mission critical underground infrastructure crossing the route of the project’s own high voltage…

Read more…

Heathrow Road Access

Henfield - Heathrow Road Access

Using: FE45 – 3.6 x 3.0 x 45 mm An underground fuel line junction required repairs on a section that ran underneath a roadway used by heavy trucks in LHR. The 2.50 m (8 foot) square hole was to be left open for a period of weeks whilst an engineered solution was manufactured. Because it…